Hantech Power Limited

Blog

» Our Blog » Blog

Deutz Diesel Generator Set Use Precautions

2017-06-14

1) After running for 50 hours, discharge the water in the oil and water separator and check electrolysis level of the battery;

2) When the new Deutz diesel generator runs for 200 to 300 hours, check the valve clearance and check the injector;

3) Every 400 hours, check and adjust the drive belt, replace it if necessary, clean radiator chip and discharge fuel tank sludge;

4) Every 600 hours or at least every 12 months, replace the lubricating oil and oil filter; replacement frequency of the oil depends on the quality of different lubricants and fuel sulfur and lubricating oil consumption of the generator set;

5) Every 800 hours of operation, change oil and water separator and fuel filter, check the turbocharger leakage situation, check the intake pip, check and clean the fuel pipeline;

6) After every 1200 hours of operation, adjust the valve clearance; after 2000 hours, replace the air filter and coolant, thoroughly clean the radiator chip and waterway;

7) Every 2400 hours after the operation, check the injector, thoroughly check and clean turbocharger, comprehensively inspect the engine equipment.

Hantech Power can provide Cummins,  Deutz,Weichai, Yuchai, HND diesel generator set, Deutz power ranges from 24kw to 450kw, with 226B, BFM1013, BFM2012, and BFM1015 series Deutz engine and Stamford, Marathon, Robot, Engga alternator.

Deutz Diesel Generator Set

Maybe you like also

  • OUR COMPANY

    About Us
    News
    Our Blog
    Our Parner
    Sales Network

  • OUR PRODUCTS

    Cummins Generator Set
    Deutz Generator Set
    MWM Generator Set
    Weichai Generator Set
    Air Cooled Generator Set

  • TECH & SUPPORT

    Parts Supply
    Aftersale Service
    Power Solution
    FAQ

  • CONTACT US

    TEL:86-027-82276722
    FAX:86-027-82775542
    Web:www.gen-set.cc